Budget/Schedule

Budget

The proposed budget for this project was no more than $1000. And with the material being steel, the total price was well above the projected budget. Thankfully, after switching the design material to 7075-T6 Aluminum the total price dropped by about 70% to $596.22. The parts list is shown below:

Schedule

The Proposal was edited continuously to keep it up to date from September when the project started to June when it ended. Fitment tests were conducted regularly, once or twice a week as the project’s construction progressed over the span of January-March. The testing portion was conducted over spring quarter (April-June). A copy of the Gantt schedule can be viewed by clicking below.